What is the lead time for customized orders?
The lead time for customized orders is typically around 30 days, depending on the complexity and quantity of the order.
Standard Lead Time by Order Type
MAGEON operates three distinct production lines, and lead time is quoted against the line your order runs on:
| Order type | Typical lead time | Notes |
|---|---|---|
| Standard catalog model (steel crawler undercarriage, 0.5-150T) | 15-20 days | Stock frames and standard track chains; can be shortened with air freight |
| Light customization (track width, frame length, hydraulic interface) | 25-35 days | Uses standard frame weldment with modified dimensions |
| Full customization (FEA-verified design, 3D modelling, prototype testing) | 40-60 days | Includes engineering drawing approval and load test |
| Batch / OEM orders (10 sets and above) | 30-45 days | Production slot scheduled after deposit; volume pricing applies |
What Determines the Actual Delivery Date
- Drawing approval - Custom orders normally require 2-3 rounds of drawing confirmation. Each round adds roughly 3-5 days, so the fastest path is to send a complete requirement sheet (machine type, working load, ground condition, mounting interface) at the first enquiry.
- Steel and track chain sourcing - Standard track chains are sourced from certified suppliers. For special profiles or larger pitch sizes, procurement can extend the schedule by 7-10 days.
- Seasonal peak - Orders placed before the European construction season and before Chinese National Day (early October) typically need 5-7 days more.
- Load testing - Every customized chassis is load tested before dispatch. Testing and reporting take 2-3 days and cannot be compressed.
How to Compress Your Lead Time
- Provide 3D drawings or a clear interface drawing instead of a description - this removes one full drawing round.
- Confirm the hydraulic motor and pump model early, since the drive package is often the longest-lead item.
- Accept a standard track width where the application allows - this is usually the single biggest time saver.
- Split the order: take the frame and drive package first, complete assemblies later. We can ship in two batches at no extra tooling cost.
Production Capacity and Payment Terms
Monthly capacity is approximately 60 sets across all lines, which means a 10-set batch occupies roughly one sixth of a month's output. A 30% deposit confirms the production slot; the balance is due against the pre-shipment inspection report, which is the standard arrangement for 85% of our European and North American customers. We also support 30% deposit with 70% against the bill of lading for established distributor accounts.
For project-based orders, we can align delivery with your construction schedule. Send us your required on-site date and we will confirm whether the production slot can meet it before you place the order.